
Demontage einer bestehenden Konstruktion
Der Preis gilt nur für die Arbeit beim Demontieren einer bestehenden Konstruktion. Mögliche zusätzliche Kosten sind nicht enthalten.
FAQ
Do I need to vacate the building during dismantling work?
Not always. For partial dismantling or internal strip out, we can often phase the work and isolate areas to keep operations running. We will confirm what is safe after the site survey and risk assessment.
Can you salvage materials for reuse during dismantling?
Yes, where practical we can separate and set aside items such as timber, steel, doors, or fittings. Tell us what you want retained in advance so we can plan the sequence and storage. Salvage depends on condition, access, and safety constraints.
How long does it take to dismantle a small outbuilding or extension?
Timeframes vary with size, construction type, and access for waste removal. Many small structures can be dismantled in one to three days, plus additional time if utilities need isolation or special disposal is required.