
Ugradnja industrijskih podova (Epoksidni podovi)
Epoksidni podovi su idealan izbor za moderna industrijska prostora. Oni nude ne samo elegantan izgled, već i visoku izdržljivost i otpornost na udarce. Ovi podovi su kemijski otporni i mogu se prilagoditi specifičnim potrebama vašeg prostora. U cijenu je uključena samo ugradnja poda.
FAQ
How long does an industrial epoxy floor take to install and cure?
Most projects take 2 to 5 days depending on preparation needs, number of coats, and site conditions. Light foot traffic is often possible within 24 hours, while heavy equipment may need 48 to 72 hours or more.
Can epoxy be installed over old paint or existing coatings?
It depends on the condition and adhesion of the existing coating. We normally recommend mechanical preparation and adhesion testing, and we remove weak or incompatible layers to prevent future peeling.
Is epoxy flooring slippery when wet?
A smooth epoxy finish can be slippery in wet or oily areas. We can add texture and slip resistant aggregates in the topcoat to improve grip while keeping the floor practical to clean.